Taison Group Construction delivered the upgrade of the maternity wing at Thika Sam’s Hospital in Thika, Kiambu County. Taison carried out the construction works to improve the layout, finishes, functionality and overall condition of the existing wing, without starting a new building.
The Taison Group Construction scope
The brief was to improve an existing facility, not replace it. Taison Group Construction planned the works around the existing building and coordinated the building trades so each stage fitted the structure already in place.
The upgrade covered the layout, the finishes and the condition of the wing. Taison Group Construction chose materials and finishes for daily use and long-term performance, so the wing is practical for patients, healthcare professionals and hospital operations.
Careful planning ran through the whole project. Taison Group Construction managed the works from site coordination through construction and finishing to handover.
Taison Group Construction built the upgrade to a design prepared by its parent company, Healthcare Designers Limited (HDL), which also advised on the project before design began. Working to a design prepared for healthcare use meant the construction team built to a clear standard from the first day on site.
Taison Group Construction is HDL’s construction subsidiary, and the relationship is stated openly on every project delivered this way.
A Viability Study tells you whether an upgrade should go ahead, and at what level, before a design fee is spent.
If you are planning a hospital upgrade or maternity wing, start with a Viability Study or request our Credentials Pack.