Taison Group Construction constructed and project managed Tayiba Hospital, Tayiba Level 4 hospital in Kisumu, Kenya. Level 4 is the sub-county hospital tier under the Kenya Essential Package for Health (KEPH). Taison is the construction subsidiary of Healthcare Designers Limited (HDL), which advised on the project and designed the hospital.
Taison Group Construction built the hospital to HDL’s design and managed the project at every stage, from site preparation and earthworks through construction and finishing to handover.
Building to a design prepared for healthcare use meant the construction team worked to a clear standard from the first day on site. Taison Group Construction coordinated the building trades and the external works as one programme.
The project included hospital parking and the external works around the building. Taison Group Construction carried out excavation, earthworks, grading, subgrade preparation, compaction, drainage installation, kerb laying, paving, parking bay construction, road marking preparation and finishing works.
Stormwater drainage was included to protect the pavement and manage surface water. The parking layout allows vehicle circulation and safe pedestrian movement, with access for patients, visitors, staff, emergency vehicles and service vehicles.
HDL’s work came before the construction. Advisory tested the project before capital was committed. Design and Consultancy then planned the hospital to the regulator’s standard.
Planning a Hospital?
A Viability Study tells you whether a hospital should be built, and at what level, before a design fee is spent.
If you are planning a hospital or healthcare facility, start with a Viability Study or request our Credentials Pack.